HOTEL LE PALME, Arzachena
Amount of work 55M€, new construction
Total area 10,000 sqm.
EIDOS HOTEL CAPITAL PARTNERS
- Project Monitoring Services
- Supervision of consultant and supplier activities
- Contracting
- Cost and schedule control
- Management reporting with ownership
ON GOING
24 months
New construction works for the entire Hotel 5 Star Luxury structure.
Starting from the previous existing Hotel, demolitions and new structure construction works are on going for the entire seafront asset.
MdL Engineering performs Project Monitoring activities supervising the work of the team of consultants and suppliers for the realization of the prestigious project that will give birth to a new beachfront resort in the beautiful scenery of the Costa Smeralda.
HOTEL BAIA DEL SOLE, Capo Vaticano, Calabria
Amount of work 6M€, redevelopment
Total 105 rooms
MEDITERRANEAN HOSPITALITY
- Supervisione attività di progettazione esecutiva
- Contrattualistica
- Controllo costi e tempistiche
- Gestione reportistica con proprietà
ON GOING
Works to Fit Out complete resort buildings, Restaurants, Bar, SPA, Reception, Park and 105 rooms
Starting from the existing already beautiful Resort, design activities are on going to realize the project to modify and upgrade the entire hotel complex, which will affect all the existing buildings of the Hotel with also the existing PEP system upgrading according to the most modern standards and the creation of a new swimming pool.
MdL Engineering, as project manager, is managing the team of consultants and suppliers for the implementation of the interventions, which will be carried out in several phases during the closing period of the Hotel.
MAX BROWN MISSORI, Milan
Amount of work 3M€, redevelopment
Total 64 rooms
SIRCLE COLLECTION
SIRCLE COLLECTION
- Supervision of executive design activities
- Selection of local designers and contractors
- Contracting
- Supervision of construction activities
- Cost and schedule control
- Management reporting with investor
2023
Fit Out works complete 7-story building consisting of 64 rooms and common areas.
Starting from the client’s concept, a specific local team was created to develop the civil and plant design oriented to an aesthetic and technological renovation of the rooms and common spaces in line with the formats of the Dutch parent company.
MdL assembled and managed the team of consultants and suppliers throughout the project until the final handover and reopening of the Hotel.
Palazzo Gaddi, Firenze
Total cost: 11.5 M€ – complete refurbishment
Hotel Bellini, Venezia
Total cost: 1 M€ – regulatory compliance works
Hotel dei Dogi, Venezia
Total cost: 2.2 M€ – regulatory compliance works
Hotel Naiadi, Roma
Total cost: 1 M€ – regulatory compliance works
COVIVIO
Artelia
- Project monitoring
- Construction site activity supervision
- Cost and timing control
- Reporting management with the investor
- Coordination with the end tenant
2019-2021
Complete renovation of a historical building in the center of Florence.
Civil and systems works for regulatory compliance in Venice and Rome.
In support of the customer’s team, it was necessary to monitor works in progress on the construction site and at the same time coordinating with technicians of the final tenant, in order to deliver on time and with the expected quality.
MdL performed Project Monitoring services.